Eagle Project – creating a trail
- Duncan B did an Eagle project of creating a trail through the wooded area at Second Presbyterian Church that links up to the newly installed bridge. This project also had to wait until late May / early June, so that Covid precautions could be developed and implemented.
The picture of Duncan on the trail without a mask, was done post project – with no one else around. The picture of Dr. Blank (with wheelbarrow) was taken with no one else around and mask off – so you could see his face.
The picture of Mr. Votaw delivering wood chips and two Scouts spreading them out in that area – shows the mask requirements.
One thought on “Eagle Project – creating a trail”
Comments are closed.
September 9, 2020 at 9:01 am
[…] Eagle Project – creating a trail […]
LikeLike